RedStreak
RedStreak
  • Home
  • Services
  • SJSG
  • Tohatchi Energy Project
  • Presentations
    • Navajo Energy Summit
  • Contact Us
  • More
    • Home
    • Services
    • SJSG
    • Tohatchi Energy Project
    • Presentations
      • Navajo Energy Summit
    • Contact Us
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out


Signed in as:

filler@godaddy.com

  • Home
  • Services
  • SJSG
  • Tohatchi Energy Project
  • Presentations
    • Navajo Energy Summit
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Tohatchi Energy Project

Infrastructure Located on the Navajo Nation

Infrastructure Located on the Navajo Nation

Infrastructure Located on the Navajo Nation

The past policy has been to build infrastructure around the Tribes. Almost all large infrastructure is not owned by the Tribes.

Capitalize on the Existing Infrastructure

Infrastructure Located on the Navajo Nation

Infrastructure Located on the Navajo Nation

Existing infrastructure around the Tohatchi Energy Project. Our plan is to use the available infrastructure and resources in our own backyard.

Approved Navajo Land Withdrawal Designation

Approved Navajo Land Withdrawal Designation

Approved Navajo Land Withdrawal Designation

The Navajo Land Department approved the Land Withdrawal Designation for the 650 acres for the Tohatchi Energy Project.

Energy/Technology Hub Master Plan

Approved Navajo Land Withdrawal Designation

Approved Navajo Land Withdrawal Designation

A multi-phase approach to converge multiple resources with technologies to bring a robust food and agricultural production, a distributed energy system with storage and a zero carbon turbine generator facility with CCS.

DOCUMENT Downloads

2023-06-29 Tohatchi Chapter Worksession Presentation vB (pdf)Download

Copyright © 2024 Tachiinii / RedStreak - All Rights Reserved.

Powered by RedStreak